We classify every crack before injecting it — structural cracks get epoxy, active leaks get flexible polyurethane, and both get a written scope before we start.

Not every Greenfield, WI foundation crack needs the same material or approach. A vertical settlement crack behaves differently than a stair-step block crack, and we adjust injection technique and material to match what's actually happening in the wall.
Our technicians are trained to tell a cosmetic hairline crack apart from one that signals structural movement, before recommending a fix.
Most crack injection appointments can be scheduled within a day or two of your call.
Pricing is based on crack length and injection material, quoted in writing before we drill any injection ports.
Polyurethane expands to fill voids behind an actively weeping wall; epoxy is reserved for cracks that need structural bonding.

We scope every Foundation Crack Repair job in person before quoting it, since two properties with the same symptom rarely need the same fix.
Structural cracks that aren't actively leaking get epoxy injection, which bonds the concrete back together rather than just sealing the surface.
Polyurethane cures even in the presence of water, which makes it the right call for a crack that's actively letting water through.
Stair-step cracking in block foundation walls needs a different injection port pattern than a vertical crack in poured concrete, and we adjust technique accordingly.
Vertical cracks are usually settlement-related and often isolated; horizontal cracks can indicate hydrostatic pressure pushing on the wall and get flagged for further evaluation.
Fast turnaround matters during a real estate transaction, and we prioritize scheduling for time-sensitive pre-sale repairs.

Photos texted ahead of time help us prep for the visit and sometimes speed up scheduling.
We also check the exterior grading near the crack, since poor drainage is often what caused it in the first place.
We explain why we're recommending one material over the other so the choice isn't a black box.
Most single-crack injections are completed in a few hours, start to finish, in one visit.

"We were selling the house and the inspector flagged a foundation crack. They came out within two days, injected epoxy, and gave us documentation for the buyer's lender."
— Greenfield Seller
"Polyurethane injection stopped an active leak the same day they showed up — didn't expect it to be that fast."
— Greenfield Homeowner
"Had two cracks — one needed epoxy, one needed polyurethane. They matched material to each one instead of using the same thing on both."
— Greenfield Customer
"Fast, clean work — no mess left behind after the injection ports were patched."
— Greenfield Homeowner
Crack classification is separate from water contamination — we assess whether the crack is structural or cosmetic based on width, pattern, and any wall bowing.
Catching a crack early with injection usually costs less than waiting until it's actively leaking.
We make the call on-site after inspecting the crack, not before we've seen it.
Multiple cracks or hard-to-access areas can extend the timeline, which we'll flag in the written quote.
A properly injected crack is unlikely to reopen at the same spot, and our work comes with a written warranty covering exactly that.
Yes — we provide before-and-after photos and a repair summary that Greenfield, WI buyers, sellers, and lenders commonly request.
We handle foundation crack injection throughout Greenfield and the surrounding Greenfield, WI service area, including the zip codes listed below.



Zip codes we serve in Greenfield, WI: 53221 53220 53228
Call now for a free inspection and a flat-rate quote before anything gets worse.
Call +1-866-476-1348© SGP Waterproofing. All rights reserved.